As noticed with the figure down below, continual auger is used to drill the borehole, raise up drilled soil, and pour concrete while the auger is moved up. As a result, the borehole does not need casing or hydrostatic pressure to circumvent damage to the borehole wall.In situations where it's preferred to get elevated frictional resistance involvin